此页面上的内容需要较新版本的 Adobe Flash Player。

获取 Adobe Flash Player

 

OLYMPIC GREEN

Beijing National Stadium

Located at the southern part of the Olympic Green in Beijing, the National Stadium is the main stadium of the 29th Olympiad in 2008. Occupying an area of 21 hectares, it has a floor space of 258,000 square meters. Its seating capacity amounts to 91,000, including 11,000 temporary seats.

The venue will host the opening and closing ceremonies of the Beijing Olympic Games and Paralympic Games, the track and field competitions, and the football finals. After the Olympics, the stadium will become a large-scale sports and entertainment facility for the residents of Beijing -- an architectural landmark and Olympic legacy.

The main body of the National Stadium has a design life of 100 years. Its fire resistance capability is first-rate, and it can withstand an eight-magnitude earthquake. The water-resistance capability of its underground project is also first-rate. The main body of the National Stadium is a colossal saddle-shaped elliptic steel structure weighing 42,000 tons. It is 333 meters long from north to south, 294 meters wide from east to west, and 69 meters tall.

The main body's elements support each other and converge into a grid formation, just like a bird's nest with interlocking branches and twigs. Being a seven-story shear wall system, the stadium's stand has a concrete framework. The upper part of the stand and the stadium's steel structure are separated from each other, but both are based on a joint footing. The roof of the National Stadium is covered by a double-layer membrane structure, with a transparent ETFE membrane fixed on the upper part of the roofing structure and a translucent PTFE membrane fixed on its lower part. A PTFE acoustic ceiling is attached to the side walls of the inner ring.

The construction of the National Stadium followed the PPP mode (Private + Public + Partnership ), and it is co-owned by the Beijing State-Owned Assets Management Co. Ltd (BSAM), who shares 58 percent of the total assets, and the China International Trust and Investment (CITIC) Consortium, who holds the rest of the assets.

Beijing National Aquatics Center

National Aquatics Center, the landmark building of Beijing 2008 Olympic Games, is located inside the Beijing Olympic Green. It is axially related to the National Stadium on the north part of Beijing Central Axis and reinforces the historical and cultural features of Beijing city. The planning area of the NSC is 62950m², and the total floor area is 65,000 - 80,000m², in which the underground component is not less than 15,000 m².

The National Aquatics Center will be the venue for swimming, diving, synchronized swimming and water-polo final during the Olympic Games. The total seating capacity is 17,000, including 6,000 permanent and 11,000 temporary for Games which will be removed post-Games, then the National Aquatics Center will become the venue for various activities such as aquatic sports, swimming, fitness and recreation.

The international competition-winning scheme is known as "Water Cube" ([H2O]³). It is designed by the design consortium consists of China State Construction Engineering Corporation, China State Construction International (Shenzhen) Design Co., Ltd, PTW Architects (Australia) and Ove Arup (Australia). The design concept of the "water cube" combines the symbolisms of the architecture and the unique water bubble structure, and build an appropriate complement to the National Stadium. The NSC functionally meets the requirement of 2008 Olympic Games and post-games operation.

P-I   Olympic Green and Great Wall at Badaling or Great Wall at Mutianyu
P-J   Olympic Green, Tian'anmen Square and Forbidden City

Pt-I   Olympic Green and Great Wall at Badaling
Pt-J   Olympic Green, Tian'anmen Square and Forbidden City

  Copyright©2012  www.peonytours.com